|
Description: In die casting fluid is injected into a mold at high pressures. Set-up time for dies is 1-2 months, after which production rates of 20-200 pieces/hr-mold are normally obtained. Maximum mass limits ..
http://www.engineersedge.com/manufacturing/die_cast_process.htm
© Copyright by Engineers Edge, LLC. All rights reserved. |