3 Attachment(s)
Compromised 10" joists with 6" plumbing holes braced instead of sistered?
We are in the process of a remodel and the guy doing the work has proposed the solution in the pictures attached. He did not raise the joists to eliminate the sag. Basically bracing the joists to each other but not sistering anything. It may be hard to see from the pictures but there are three joists with holds cut through them. The one closest to the wall and the next two over. The length of the joists is 12 feet.
The floor above the ceiling that is being supported by these joists is a tiled bathroom floor and toilet.
Any feedback is greatly appreciated.