I have determined that the accepted, modern, available material for structural tubing to replace "dural" is 2024 -T3.
O.P.
Thanks.
Type: Posts; User: garyboyco
I have determined that the accepted, modern, available material for structural tubing to replace "dural" is 2024 -T3.
O.P.
Thanks.
I would 3D print the frame with an internal channel. Volume production is another matter.
3D printing is not "expensive" for volume production, it is slow.
This is usually dealt with by having...