Page 1 of 2 1 2 LastLast
Threads 1 to 20 of 40

Forum: Excel Calculators

Excel calculators, spread sheets and other manufacturing, design and engineering applications.

    • Replies: 2
    • Views: 16,246
    04-30-2023, 03:29 PM Go to last post
  1. piping dead weight calculation

    Started by ashish_shrivastava, 04-26-2019 01:05 AM
    • Replies: 1
    • Views: 11,822
    04-28-2023, 03:07 PM Go to last post
  2. Cost of Manufacturing

    Started by uddalok_biswas, 06-28-2022 06:34 AM
    manufacturing, manufacturing cost
    • Replies: 2
    • Views: 10,473
    04-01-2023, 04:38 PM Go to last post
    • Replies: 2
    • Views: 11,368
    07-14-2021, 10:32 AM Go to last post
  3. Electric Motor Starting Calculations

    Started by Kelly_Bramble, 04-15-2012 08:12 AM
    • Replies: 3
    • Views: 16,904
    06-24-2021, 07:47 AM Go to last post
    • Replies: 10
    • Views: 12,220
    05-06-2021, 03:28 AM Go to last post
  4. Engineering software

    Started by oscar_gandara, 12-12-2017 01:51 PM
    project, software, tracking
    • Replies: 2
    • Views: 14,837
    03-12-2019, 09:49 PM Go to last post
  5. UK Railway Excel Calculators

    Started by christian Bendis, 08-10-2017 02:02 PM
    • Replies: 3
    • Views: 11,705
    08-17-2018, 09:45 AM Go to last post
  6. Coefficient of friction

    Started by khisyamh, 06-07-2017 09:36 PM
    • Replies: 0
    • Views: 8,634
    06-07-2017, 09:36 PM Go to last post
  7. Home Work three phase separator calculation

    Started by cookienurozhang, 02-14-2017 02:10 AM
    three phase separator
    • Replies: 0
    • Views: 8,801
    02-14-2017, 02:10 AM Go to last post
  8. Red face ASME – Cone design calculator

    Started by joel_bogaert, 08-08-2016 09:14 AM
    • Replies: 3
    • Views: 18,787
    08-16-2016, 01:38 PM Go to last post
  9. Activated Sludge Calculations

    Started by Eng., 01-22-2016 01:15 PM
    • Replies: 3
    • Views: 13,944
    02-03-2016, 08:24 AM Go to last post
  10. PDF BOM to Excel

    Started by Fishon91, 01-01-2016 11:31 AM
    • Replies: 2
    • Views: 9,855
    01-01-2016, 11:49 AM Go to last post
  11. Electrical Panelboard Load Calculator

    Started by Kelly_Bramble, 04-15-2012 08:36 AM
    • Replies: 10
    • Views: 28,921
    12-13-2015, 02:59 PM Go to last post
  12. Structural Rectangular Spread Footing Analysis

    Started by Cragyon, 02-25-2013 03:05 PM
    • Replies: 2
    • Views: 14,324
    05-24-2015, 09:59 AM Go to last post
  13. Belt Length Calculation with Eccentric cams

    Started by GhostRider, 11-06-2014 01:11 PM
    • Replies: 1
    • Views: 7,957
    11-06-2014, 01:58 PM Go to last post
  14. Structural Beam Column Splice Calculations

    Started by Cragyon, 08-05-2014 09:07 AM
    • Replies: 0
    • Views: 10,115
    08-05-2014, 09:07 AM Go to last post
  15. Precast Pre-Tensioned Beam Design Calculator

    Started by Cragyon, 07-31-2014 12:55 PM
    • Replies: 0
    • Views: 7,597
    07-31-2014, 12:55 PM Go to last post
    • Replies: 2
    • Views: 9,067
    07-31-2014, 12:51 PM Go to last post
    • Replies: 0
    • Views: 8,141
    07-25-2014, 03:46 PM Go to last post

Forum Information and Options

Moderators of this Forum

Thread Display Options

Use this control to limit the display of threads to those newer than the specified time frame.

Allows you to choose the data by which the thread list will be sorted.

Order threads in...

Note: when sorting by date, 'descending order' will show the newest results first.

Icon Legend

Contains unread posts
Contains unread posts
Contains no unread posts
Contains no unread posts
More than 15 replies or 150 views
Hot thread with unread posts
More than 15 replies or 150 views
Hot thread with no unread posts
Closed Thread
Thread is closed
Thread Contains a Message Written By You
You have posted in this thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •