i have 4.5m span currently with a 10 x 10 deep beam to be casted ,it is simply supported by 10 x 10 columns ,would 3t12 or 2T16 in the tension side suffice with a spacing of 8" per links? ,the floor is to be supported over the living room area .any help would be appreciated ,im aware of BS8110 beam design